Home  /  About

Built for the age
of accelerators

Ferrowatt started in 2021 with a simple observation: AI clusters kept outgrowing the buildings around them. So we started designing buildings around the clusters.

One team, from concrete to cluster

Most colocation means adapting your hardware to somebody else's floor. We flipped it: our architects, power engineers and network team design each hall around the exact racks going in — down to busway taps and coolant loop routing.

Today Ferrowatt operates three high-density facilities in Northern Virginia with 40MW of commissioned power, a fourth hall under construction, and a single standard that never changes: every megawatt metered, every ticket answered by someone on site.

Start deployment
FactFigure
Founded2021, Ashburn VA
Live facilities3 halls · 40MW commissioned
Rack densityUp to 120kW per rack
Fleet uptime99% trailing twelve months
Deployed accelerators75+ petaflops under management
On-site staffEngineers 24/7, every site
How we work02
01

Density first

Every hall is engineered for 100kW+ racks from day one — no retrofits, no derating, no surprises when your next cluster funds.

02

Metered honesty

Submetered power at wholesale pass-through, published PUE monthly, and one invoice that shows every kilowatt. If we waste it, you see it.

03

Humans on site

Remote hands means our engineers, not a call center. Median smart-hands response is under 15 minutes, around the clock.

See a hall before you sign anything

Tour the Ashburn campus, meet the ops team and watch a live burn-in. We will hold capacity for 30 days after your visit.

Book a tour