Datacenter design & build

Turnkey high-density halls — from soil survey to burn-in — engineered around your exact racks instead of the other way around.

Start deployment

What this service entails

A greenfield or retrofit hall scoped to your fleet: utility power procurement, busway and PDU layout for 100kW+ racks, liquid-to-chip cooling loops, and a spine-leaf fabric with carrier-neutral meet-me rooms.

We hold single-point responsibility — civil, mechanical, electrical and network under one contract — so there is nobody to point at except us. Typical greenfield delivery runs 9–12 months; retrofits of existing shell space run 4–6.

  • Utility & power procurementSubstation capacity, generators and UPS sized with N+1 or 2N redundancy.
  • Liquid cooling loopsDirect-to-chip and rear-door heat exchangers rated for 120kW racks.
  • Fabric & fiberSpine-leaf design, diverse entrances and dark-fiber paths to peering hubs.
  • Commissioning & burn-inIntegrated systems testing plus full-load thermal trials before handover.
Build standards02

Rated for the loads AI actually draws

Legacy halls derate past 15kW per rack. Ours are specified from the breaker up for sustained accelerator draw, with metering at every level.

SystemStandard
Rack densityUp to 120kW, busway-fed
RedundancyN+1 mechanical, 2N electrical option
Cooling design PUE1.15 annualized, Ashburn climate
Fire suppressionVESDA + pre-action sprinkler
CertificationsSOC 2 Type II, ISO 27001 path

Scope your hall in one site survey

Send rack counts and kW per rack — we return layout, power plan and a fixed delivery date.